Phu My Bridge - high performance construction over the Saigon River
Drucken
Impressive 705 meter stay-cable Phu My bridge that has a center span of 380 meters has been completed at end of August 2009 and is part of the new ring road that will connect the Mekong Delta Region in the south with Central and North Vietnam, allowing for more convenient logistics and improving the traffic conditions in the city center significantly.
The vertical clearance of 45 meters in a 200 meters wide zone ensures that river traffic and large vessels can flow unimpeded; each pylon is about 140 meters high and is supported by twenty-eight large bored piles of approximately 2.1 meters in diameter and 75 meters in length. Such a project could only be realized by expert design and construction specialists, using best quality construction materials.

Deck slabs and pylons were built with concrete using Holcim Ready Flow cement, which displays a good workability and also a very high early concrete strength and durability. Workability and high early concrete strength ensured the contractor would meet the construction deadline as the concrete allowed for a 5 day rotation time to cast the deck segments of the bridge and to move the formwork to its next position. High durability promises a long life for the bridge.

Holcim Mass Pour cement was used to build the 4 massive pile caps that connect the huge pylons to the bored piles. The low heat cement has contributed to reducing the heat development in the large mass of concrete forming the pile caps, avoiding the risk of cracks that would have endangered the structural integrity of the bridge.

Holcim Vietnam provided main contractor BBBH (a consortium between Bilfinger Berger and its subsidiary Baulderstone Hornibrook) with a tailored solution, including delivery logistics, to realize the project and its efficient execution. The technical support team of Holcim followed the jobsite closely, at the initial mix-design and during execution, to avoid any possible issues or delays. Holcim Vietnam’s supply chain department assured a smooth delivery of cement in sometimes very challenging circumstances. To execute large pours without delay, Holcim Beton assisted the batching plants on the jobsite with high-quality ready-mix concrete, compliant to the specifications of the jobsite.

To read more about the Phu My Bridge
 
References
References overview
Twin Center, Casablanca, Holcim Maroc, Morocco
Christchurch Art Gallery, Holcim New Zealand
Gotthard Base Tunnel, Holcim Switzerland
Itaipu hydroelectric power plant, Holcim Brasil, Brazil
Toronto International Airport, St. Lawrence Cement/Dufferin Concrete, Canada
New government center in Minas Gerais – in concrete suspension
Phu My Bridge - high performance construction over the Saigon River
   |   
   |   
   |   
   |   
Strength. Performance. Passion.